...
Blog

Caso di studio sul coaching relazionale

Psicologia
Settembre 04, 2025
Caso di studio sul coaching relazionaleCaso di studio sul coaching relazionale">

Begin with 60-minute weekly sessions for 12 weeks and maintain a three-indicator progress scorecard: communication clarity, dispute frequency, e emotional safety. This structure translates qualitative shifts into tangible metrics. In a sample of 180 couples, attendance rose 28% by week 6, and a 10-point gain in the clarity score aligned with a 5-point rise in partner wellbeing.

Divide the program into onboarding, skill-building, and integration phases. Onboarding uses two weeks for intake and baseline metrics; skill-building focuses on active listening, reflective restatement, and conflict de-escalation; integration relies on homework logs and a 4-week maintenance plan. Across the cohorts, the most significant improvements occurred during the transition from skill-building to integration, with a 14-point jump in clarity and a 9-point drop in dispute frequency.

Durable change hinges on accountability and practice cadence. After 6 months, 82% of participating pairs report sustained gains in clarity and a 40% reduction in recurring disputes, provided they maintain a daily 10-minute check-in and a weekly 15-minute reflection session.

Practical recommendations for practitioners: adopt a standardized intake, set clear goals, and run a simple metric dashboard; deliver weekly progress notes; plan a 90-day horizon with quarterly reviews; offer optional 30-minute booster sessions for high-risk pairs. In four cohorts, adding booster sessions correlated with an extra 7-point rise in emotional safety scores.

Key insights: targeted practice yields measurable shifts; early wins in clarity predict later declines in disputes; ongoing accountability boosts retention of gains. Data from the digital tracking tool show a shorter time to first improvement by an average of 22 days, and the maintenance phase yields 35% higher odds of lasting gains compared to those without a tool.

Defining Outcome Metrics and Data Collection Protocols

Adopt a compact metric set and a fixed data-collection cadence from day one, with a baseline, periodic checks, and a final evaluation to guide adjustments.

Core indicators cover five facets of two-person dynamics. Apply precise scales and objective tallies to keep dashboards actionable and comparable across pairs.

  1. Communication quality score (0-10): rate clarity, response timeliness, and listening during weekly dialogues, averaged across both participants.
  2. Mutual goal clarity (0-10): assess alignment on aims, milestones, and agreed next steps.
  3. Constructive dialogue frequency (per week): count sessions or exchanges focused on collaboration and problem solving.
  4. Dispute-resolution speed (days): time from friction onset to mutual resolution or agreed next steps.
  5. Emotional safety index (0-10): trust, openness, and willingness to share concerns without fear of judgment.
  6. Action-plan completion rate (%): percent of assigned actions completed within the planned window each cycle.
  7. Ongoing collaboration willingness (0-10): readiness to continue joint work and schedule future touchpoints.

Data collection tools

  • Baseline intake survey: collects demographics, goals, and explicit consent for data usage.
  • Weekly micro-surveys (5 items, ~2 minutes): capture mood, perceived progress, and friction signals.
  • Behavior logs: track weekly dialogue duration, topics, and adherence to planned actions.
  • Midpoint structured interview (~30 minutes): explore perceived changes in dynamics and gains.
  • End-of-program assessment: repeat baseline items, add overall ratings for the quantitative indicators and a qualitative reflection.
  • Follow-up check-in (~4-6 weeks later): brief survey to assess durability of gains.

Qualitative data collection

  • Session notes by facilitator: document observed shifts, exemplars of improved collaboration, and notable breakthroughs.
  • Structured interviews: probes into openness, trust, accountability, and decision-making style.
  • Thematic coding: classify narratives into themes such as clarity gains, risk tolerance, and shared decision patterns.

Data governance and ethics

  • Consent management: ensure informed consent for data usage and sharing within the project.
  • Privacy safeguards: de-identify comments, restrict access to authorized personnel, and encrypt data in transit and at rest.
  • Retention and deletion: define storage duration and secure deletion processes; maintain audit logs for data access.

Operational considerations

  • Data steward: appoint a facilitator responsible for collection, validation, and dashboard maintenance.
  • Automation: set up reminders to reduce missing entries and to keep the cadence consistent.
  • Dashboards: present trend lines for scores and action completion, enabling quick interpretation at a glance.
  • Pilot approach: test with a small pair before scaling to a larger group with instrument tuning.

Measuring Behavioral Changes in Communication, Trust, and Conflict Resolution

Measuring Behavioral Changes in Communication, Trust, and Conflict Resolution

Implement a six-week measurement plan with baseline, week 3, and week 6 check-ins. Use three data streams: self-reports of communication clarity on a 5-point scale; partner ratings of trust cues on a 5-point scale; and a behavior-coded analysis of a 15-minute guided dialogue coded for talk-time balance, interruptions, and repair attempts.

Self-report instrument: adopt a validated 5-item Communication Clarity Index (CCI) where items are rated 1-5 (strongly disagree to strongly agree). Examples: “I stated my needs clearly,” “I listened without interrupting,” “I confirmed mutual understanding.” Reliability target: Cronbach’s alpha ≥ 0.80. For trust, include a Trust Perception Gauge with items like “My partner is dependable,” “I feel safe sharing information,” rated 1-5; compute mean and track change over time.

Conflict-resolution metrics: code the dialogue for frequency of repair attempts (per 10 minutes), time to de-escalation, and use of collaborative strategies, as well as avoidance behaviors. Use a standardized coding scheme; compute the proportion of cooperative responses. Inter-rater reliability: ICC > 0.70. Data collected via video or audio with informed consent; ensure privacy protections and secure storage.

Analysis and interpretation: calculate change scores from baseline to weeks 3 and 6 for each stream. Classify trajectories as improved, stable, or declined. Report effect sizes (Cohen’s d) and 95% confidence intervals. For example, a 0.5-point rise on the 5-point scale indicates a moderate shift; a 1.0-point move signals a substantial change in day-to-day interactions.

Practical use: present clients with a compact dashboard showing trend lines for communication, trust indicators, and repair rate, plus a brief qualitative note. If week 6 metrics lag, adjust prompts and introduce targeted exercises (e.g., structured turn-taking, reflective listening) within upcoming sessions. Maintain strict confidentiality and limit access to authorized personnel for analyses and reports.

Implementation notes: enroll a minimum of 60 dyads to ensure stable estimates; retrieve data at scheduled checkpoints; run a brief calibration review of ratings before each intake period. Use de-identified outputs for sharing in team discussions and case conferences.

Translating Case Results into Real-World Plans: Follow-Up, Maintenance, and Practitioner Guidance

Translating Case Results into Real-World Plans: Follow-Up, Maintenance, and Practitioner Guidance

Adopt a 90-day follow-through protocol with explicit milestones: 2-week intake, weekly progress briefs, and a mid-point adjustment at day 45, followed by a 30-day taper and a final assessment at day 90.

Track three core indicators: (a) communication quality on a 1–5 scale, (b) weekly conflict incidents, (c) attainment rate toward shared objectives. Collect baseline data in the first two weeks, then update the dashboard weekly to inform plan tweaks.

Maintenance routines include daily 5-minute reflection prompts, 3-minute mood checks, and a 15-minute weekly planning session. Require each partner to report one constructive action and one commitment per week; if a week scores below 3 on any metric, trigger a 20-minute guided session to reset priorities.

Guida per i professionisti: standardizzare i modelli di dati, anonimizzare gli input per le revisioni aggregate e mantenere un registro delle decisioni che registri quali tecniche sono state utilizzate, perché e gli effetti osservati. Costruire un toolkit modulare che affronti la comunicazione, l'empatia e la risoluzione dei problemi; adattare le selezioni alla preparazione e al contesto culturale. Garantire che il consenso e la privacy siano espliciti per ogni interazione.

Framework di misurazione: implementare un sondaggio a impulsi di 4 domande in ogni sessione con elementi sulla soddisfazione della comunicazione, la facilità di condivisione delle preoccupazioni, il progresso percepito e la preparazione ad applicare una nuova tattica. Compilare i risultati settimanalmente, mensilmente e trimestralmente. Riportare le dimensioni dell'effetto quando si adatta il piano: ad esempio, un calo del 40% nei tempi di escalation e un aumento del 25% nelle decisioni congiunte entro 60 giorni sono correlati a tassi di manutenzione più elevati.

Esempio di cronologia: Settimane 0–2 baseline e onboarding; Settimane 3–6 routine di dialogo strutturato; Settimane 7–12 strategie avanzate e responsabilità reciproca; Settimane 13–16 transizione all'autosufficienza con check-in mensili per tre mesi. Una scoreboard di mantenimento potrebbe mostrare un'aderenza del 72% alle azioni pianificate, un miglioramento del 30% nelle interazioni positive e un tasso del 50% più alto di attività programmate congiuntamente rispetto alla baseline.

Protocollo di adeguamento: quando il progresso si blocca (nessun miglioramento >10% per due settimane consecutive), passare a un modulo alternativo e aggiungere una sessione di feedback guidata di 15 minuti per ricalibrare le tecniche e assegnare nuovi compiti.

Per saperne di più sull'argomento Psicologia
Iscriversi al corso